RedMax PSZ2500 Spécifications Page 15

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 40
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 14
MOUNTING ENGINE (SE1)
1. Push the driveshaft housing toward the clutch
housing and rotate it by hand to check that the
driveshaft is engaged with the gears.
2. Insert the driveshaft housing into the clutch
housing until it bottoms, and align the positioning
holes on the clutch housing and the shaft tube
and install the screw. When difficult to engage,
twist the engine slightly.
3. Fasten the clamp securely with two screws.
Tighten the screws gradually by turns.
CONNECTING THROTTLE WIRE
1. Remove the air cleaner cover.
2. Connect the end of the throttle wire to the joint
on the top of the carburetor. (SE2)
CONNECTING SWITCH WIRES
Connect the switch wires between the engine
and the main unit. Pair the wires of the same
color.
ATTACHING THE PRUNING MECHANISM (SE3)
1. Remove the cap on the end of the main pipe.
2. Remove the screw screwed into the end of the
gear case.
3. Insert the end of the gear case into the main
pipe.
4. Line up the hole on the end of the gear case into
which the screw is to be inserted with the hole
on the main pipe, and screw the screw firmly in.
5. Using a wrench, screw in the bolt provided to fix
the mechanism into place.
(1) Main pipe
(2) Gear case
(3) Screw hole
(4) Fastening bolt
(5) Bolt
IMPORTANT
6. Set up
15
SE1
SE2
(1)
(2)
(3)
(4)
(5)
SE3
Vue de la page 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 39 40

Commentaires sur ces manuels

Pas de commentaire